{"id":1715,"date":"2026-03-08T14:45:19","date_gmt":"2026-03-08T14:45:19","guid":{"rendered":"https:\/\/solutionsrenovationquebec.ca\/?p=1715"},"modified":"2026-07-23T19:01:08","modified_gmt":"2026-07-23T19:01:08","slug":"bathroom-renovation-how-long-does-it-really-take-in-quebec","status":"publish","type":"post","link":"https:\/\/solutionsrenovationquebec.ca\/en\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/","title":{"rendered":"Bathroom renovation: how long does it really take in Quebec?"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">This is probably the question we get asked most often before starting a project. And honestly, it's a good question, because the timelines announced on the internet are often far from the reality we experience on the ground here, in Quebec.<\/span><\/p>\n<p><a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/services\/bathroom-renovation\/\"><span style=\"font-weight: 400;\">A complete bathroom renovation takes on average <\/span><b>4 to 6 weeks<\/b><\/a><span style=\"font-weight: 400;\">. A partial refresh, on the other hand, can be done in <\/span><b>7 to 10 business days<\/b><span style=\"font-weight: 400;\">. But between these two extremes, there's everything most homeowners don't see coming: the state of the plumbing behind the walls, the humidity accumulated over 20 years, material delivery delays, and the RBQ standards that apply regardless of the size of the project.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In this guide, we clearly explain what to expect, and how to plan well to avoid unpleasant surprises.<\/span><\/p>\n<h2><b>How long does a bathroom renovation really take?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The short answer: it depends on what we're touching. The complete answer is what we're going to give you here.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">There's a big difference between changing a sink and redoing a bathroom from A to Z. Timelines vary depending on the complexity of the work, the condition of the existing structure, and material choices. <a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/areas\/levis\/\">What we often see in homes in L\u00e9vis<\/a>, Quebec City or Beauce, are bathrooms that haven't changed since the 80s, and there, you need to allow more time.<\/span><\/p>\n<h3><b>The average timelines observed in Quebec<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Here's what we generally see on our job sites, after more than 500 completed projects:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Light refresh<\/b><span style=\"font-weight: 400;\"> (painting, accessories, faucets): <\/span><b>7 to 10 business days<\/b><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Small bathroom<\/b><span style=\"font-weight: 400;\"> (replacement of ceramic tile, vanity, shower): <\/span><b>3 to 5 weeks<\/b><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Complete renovation<\/b><span style=\"font-weight: 400;\"> (full demolition, plumbing, electrical, finishes): <\/span><b>4 to 6 weeks<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">These timelines take into account demolition, plumbing and ventilation work, material drying time, and installation of finishes. Each step has its own pace, and some cannot be accelerated.<\/span><\/p>\n<h3><b>Why some projects take longer<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The reality is that homes built before 1980, and there are many in <a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/areas\/quebec\/\">Qu\u00e9bec,<\/a> often hide surprises. Once we open the walls, we can find weakened copper plumbing, undetected traces of humidity, or even <a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/services\/decontamination-insulation\/\">mold<\/a> behind the bathtub.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In these cases, we stop, we assess, we explain to you what we found, and we adapt the plan. It's not a delay that can be predicted in advance, but it's something a good contractor must anticipate in their approach.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Material delivery times can also play a role. Certain tiles, certain vanities or certain high-end faucet items have order lead times of 2 to 4 weeks. That's why we place orders right from the planning stage.<\/span><\/p>\n<h3><b>Get a realistic estimate for your project<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Every bathroom is different.<\/span><a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/\"> <b>Request your free on-site quote<\/b><\/a><span style=\"font-weight: 400;\">, we come to your home, we assess the real condition of your bathroom, and we give you a clear timeline and budget before starting anything.<\/span><\/p>\n<h2><b>The steps of a bathroom renovation, and their duration<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Understanding the steps means understanding why the timelines are what they are. It's not slowness, it's rigor.<\/span><\/p>\n<h3><b>Planning and project quote<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Before lifting a hammer, we do an on-site visit. We inspect the existing plumbing, we assess the space, we talk about your needs and your budget. That's where we detect potential problems before they become costly.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This step generally takes <\/span><b>3 to 7 days<\/b><span style=\"font-weight: 400;\">, including preparation of the detailed quote. It's time well invested, it avoids surprises during the work.<\/span><\/p>\n<h3><b>Demolition and preparation<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Demolition is more than tearing out ceramic tile. We remove the bathtub or shower, the vanity, the wall coverings. We inspect the structure, the joists, the condition of the subfloor. If we find something abnormal, we show it to you before continuing.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Average duration: <\/span><b>1 to 3 days<\/b><span style=\"font-weight: 400;\">, depending on the size of the room and what we discover.<\/span><\/p>\n<h3><b>Technical work: plumbing, electrical, ventilation<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">This is the most critical step, and the one homeowners see the least, but which protects their home for the next 20 years.<\/span><\/p>\n<h4><b>Mandatory technical standards<\/b><\/h4>\n<p><span style=\"font-weight: 400;\">A bathroom must comply with precise standards according to the Quebec Construction Code. This includes:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The <\/span><b>mechanical ventilation<\/b><span style=\"font-weight: 400;\"> to evacuate humidity (an improperly sized exhaust fan means mold in 5 years)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The <\/span><b>protected electrical circuits<\/b><span style=\"font-weight: 400;\"> (GFCI required near water)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The\u2019<\/span><b>compliant plumbing installation<\/b><span style=\"font-weight: 400;\"> to RBQ standards<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">All these steps are carried out by specialists and verified according to the requirements of our RBQ license <\/span><b>5811-7821-01<\/b><span style=\"font-weight: 400;\">. This is not optional, it is what protects your home and your family.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Duration: <\/span><b>3 to 7 days<\/b><span style=\"font-weight: 400;\"> depending on the complexity of the modifications.<\/span><\/p>\n<h3><b>Installation of materials and finishes<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">This is where the bathroom takes shape: laying ceramic tile, installing the shower or bathtub, mounting the vanity, faucets, painting, silicone. Each material has its drying time. Ceramic tile, for example, requires a minimum of 24 hours before it can be used after grouting.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Duration: <\/span><b>5 to 10 days<\/b><span style=\"font-weight: 400;\">, depending on the materials chosen and the surface area to be covered.<\/span><\/p>\n<h2><b>Why the Quebec climate influences timelines<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">You don't renovate a bathroom in L\u00e9vis the way you would in Florida. The climate here imposes additional requirements, and ignoring them means paying twice.<\/span><\/p>\n<h3><b>Humidity and mold prevention<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">A poorly ventilated bathroom in Quebec means a mold problem in less than 3 years. That's why we systematically install compliant exhaust fans, waterproof membranes behind shower tiles, and use high-quality silicone seals designed to withstand constant humidity.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These steps take time, but they prevent repairs of <\/span><b>$5,000 to $15,000<\/b><span style=\"font-weight: 400;\"> in the years that follow <\/span><i><span style=\"font-weight: 400;\">(reasonable estimate based on common decontamination projects)<\/span><\/i><span style=\"font-weight: 400;\">.<\/span><\/p>\n<h3><b>Impact of freeze-thaw on older homes<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">In homes built between 1960 and 1990, and there are many throughout Chaudi\u00e8re-Appalaches, in <a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/areas\/beauce\/\">Beauce<\/a>, in Quebec City, freeze-thaw cycles have often weakened plumbing, shifted foundations or created cracks in structures. We see it regularly.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Before installing new materials, we make sure the underlying structure is sound. This can add a day or two, but it's this rigor that makes the difference between a renovation that lasts 10 years and one that crumbles in 3.<\/span><\/p>\n<h2><b>The mistakes that often lengthen a renovation<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">We'll be direct with you. Some common misconceptions cost homeowners dearly, in time and money.<\/span><\/p>\n<h3><b>Myth 1, A bathroom renovation can be done in a few days<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">We see videos on YouTube showing complete transformations in 48 hours. That's not the reality of job sites compliant with RBQ standards. Plumbing, electrical, ventilation, all of that takes the time it takes. An contractor who promises you a complete bathroom in 3 days, ask him questions about his license.<\/span><\/p>\n<h3><b>Myth 2, DIY is always cheaper<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Renovating yourself may seem economical. But a non-compliant plumbing error, a poorly installed shower seal or insufficient ventilation can cause significant damage in walls and floors. We regularly intervene to correct homemade work, and in most cases, it costs more than if the work had been done properly from the start.<\/span><\/p>\n<h3><b>Myth 3, Cheap materials last just as long<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">In Quebec, humidity and temperature variations are constant. Low-end caulking cracks within two winters. Low-density ceramic tile absorbs water. We choose materials suited to the Quebec context, not the cheapest on the market, but those that hold up over time.<\/span><\/p>\n<h2><b>How much does a bathroom renovation cost in Quebec?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The budget question always goes hand in hand with that of timelines. Here is what we observe on the market in 2026.<\/span><\/p>\n<h3><b>Average budget by type of project<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Economical<\/b><span style=\"font-weight: 400;\"> (standard materials, simple configuration): <\/span><b>$15,000 to $20,000<\/b><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Mid-range<\/b><span style=\"font-weight: 400;\"> (quality tile, Italian shower, custom vanity): <\/span><b>$25,000 to $35,000<\/b><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>High-end<\/b><span style=\"font-weight: 400;\"> (premium materials, complete reconfiguration, freestanding bathtub): <\/span><b>$40,000 and up<\/b><\/li>\n<\/ul>\n<p><i><span style=\"font-weight: 400;\">(These ranges are reasonable estimates based on common projects in Quebec in 2025-2026. Your project may vary depending on the configuration and materials chosen.)<\/span><\/i><\/p>\n<h3><b>Why costs have increased since 2020<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">It's no secret: construction materials have increased by approximately <\/span><b>40%<\/b><span style=\"font-weight: 400;\"> since 2020 <\/span><i><span style=\"font-weight: 400;\">(reasonable estimate based on trends observed in the residential renovation sector in Quebec)<\/span><\/i><span style=\"font-weight: 400;\">. The shortage of skilled labor in the construction trades has also driven up prices.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A contractor who offers you an abnormally low price in 2026 should raise questions. Either the materials are of inferior quality, or not all standards are being met. In our field, the right price is the one that corresponds to a job well done.<\/span><\/p>\n<h2><b>How to avoid delays in your renovation project<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The best way to avoid unexpected delays is to plan well. Here's how we approach it at SRQ.<\/span><\/p>\n<h3><b>Choosing an RBQ-certified contractor<\/b><\/h3>\n<h4><b>Why the RBQ license protects homeowners<\/b><\/h4>\n<p><span style=\"font-weight: 400;\">A contractor with a license <a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/renovate-your-bathroom-yourself-or-hire-a-rbq-pro-in-levis\/\">RBQ<\/a> valid has demonstrated their technical skills, is insured, and is subject to specific rules. If a problem arises, you have recourse. Without a license, you have virtually none.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Our RBQ license <\/span><b>5811-7821-01<\/b><span style=\"font-weight: 400;\"> is verifiable directly on the R\u00e9gie du b\u00e2timent du Qu\u00e9bec website. We encourage you to do so, and to do it for any other contractor you consult as well.<\/span><\/p>\n<h3><b>Planning materials and design in advance<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The most common delays we see on job sites? Materials that haven't arrived. Some imported tiles, certain specialized plumbing items, or certain custom accessories can take 3 to 6 weeks to deliver.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">We solve this problem by placing orders as soon as the quote is accepted, even before starting demolition. It's a simple step that can save two weeks on a project.<\/span><\/p>\n<h3><b>Plan your renovation with a local contractor<\/b><\/h3>\n<p><a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/\"><b>Contact us for a free consultation<\/b><\/a><span style=\"font-weight: 400;\">, we take the time to understand your project, we explain the steps to you, and we offer you a realistic timeline from the start.<\/span><\/p>\n<h2><b>Why trust Solutions R\u00e9novation Qu\u00e9bec (SRQ)<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">We're not going to give you a list of superlatives. We'll just tell you what we do, and how we do it.<\/span><\/p>\n<h3><b>Recognized RBQ contractor in Quebec<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">SRQ is a residential renovation company based in L\u00e9vis, holding the RBQ license <\/span><b>5811-7821-01<\/b><span style=\"font-weight: 400;\">. All our work is carried out in compliance with the <a href=\"https:\/\/nrc.canada.ca\/fr\/certifications-evaluations-normes\/codes-canada\/publications-codes-canada\/code-construction-quebec-chapitre-i-batiment-code-national-batiment-canada-2020-modifie\">Quebec Construction Code.<\/a> It's not a box we check, it's the way we work.<\/span><\/p>\n<h3><b>A simple and transparent process<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Here's how it works with us:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Free on-site quote<\/b><span style=\"font-weight: 400;\">, we come to evaluate your project at your home, free of charge and with no obligation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Project planning<\/b><span style=\"font-weight: 400;\">, timeline, materials, clear steps<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Clean and safe work<\/b><span style=\"font-weight: 400;\">, organized job site, respect for your home and your daily life<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Final inspection<\/b><span style=\"font-weight: 400;\">, we don't close a job site until you're satisfied<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">No surprises along the way. No hidden fees. That's how we've been working from the start.<\/span><\/p>\n<h3><b>Warranty and experience<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">We have completed <\/span><b>more than 500 projects<\/b><span style=\"font-weight: 400;\"> in Quebec, bathrooms, kitchens, <a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/services\/basement-finishing\/\">basements<\/a>, <a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/services\/residential-roofing\/\">roofs<\/a>, and <a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/services\/exterior-cladding\/\">exterior siding.<\/a> In bungalows in L\u00e9vis, century-old homes in Beauce, family properties in the Quebec City region.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Every project is covered by a <\/span><b>5-year warranty on labor<\/b><span style=\"font-weight: 400;\">. If something goes wrong within 5 years of our work, we come back, period.<\/span><\/p>\n<h3><b>Request a free quote<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Your project deserves a serious evaluation.<\/span><a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/\"> <b>Fill out our quote form<\/b><\/a><span style=\"font-weight: 400;\"> or call us directly at <\/span><b>418-476-1747<\/b><span style=\"font-weight: 400;\">. We respond within 24 hours, Monday to Friday.<\/span><\/p>\n<h2><b>FAQ, Bathroom renovation in Quebec<\/b><\/h2>\n<h3><b>How long does a complete renovation take?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">On average <\/span><b>4 to 6 weeks<\/b><span style=\"font-weight: 400;\">, depending on the condition of the existing plumbing, the size of the room, and the materials chosen. A partial renovation or a refresh can be done in 7 to 10 business days.<\/span><\/p>\n<h3><b>Can a bathroom be renovated in one week?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Only for minor changes like faucets, paint, or accessories. A complete renovation that includes plumbing, electrical, and tile cannot be done properly in one week.<\/span><\/p>\n<h3><b>Do you need an RBQ contractor for a bathroom renovation?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Yes, as soon as the work involves plumbing, electrical, or structure. An unlicensed contractor cannot guarantee the compliance of the work, and you won't have any recourse if there's a problem.<\/span><\/p>\n<h3><b>What budget should you plan for a bathroom in Quebec?<\/b><span style=\"font-weight: 400;\">\u00a0<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Between <\/span><b>15,000 $ and 40,000 $+<\/b><span style=\"font-weight: 400;\"> depending on the level of finish and the complexity of the work. An on-site quote will give you a precise figure for your situation.<\/span><\/p>\n<h3><b>Do older homes take longer to renovate?<\/b><span style=\"font-weight: 400;\">\u00a0<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Yes. Homes over 25-30 years old often have aging plumbing, structures that have shifted and materials that require more preparation. That's why the inspection before the work is so important.<\/span><\/p>\n<h3><b>Can the bathroom be used during the work?<\/b><span style=\"font-weight: 400;\">\u00a0<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Generally no, especially during the demolition, plumbing and tile phases. For families with only one bathroom, we try to plan the stages to minimize inconvenience, this is something we discuss from the planning stage.<\/span><\/p>\n<h3><b>How can you avoid delays in a renovation project?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Two things make the difference: choosing an organized contractor, and finalizing material choices before the work begins. When decisions are made in advance, the site progresses without interruption.<\/span><\/p>\n<h3><b>Do the chosen materials influence the duration of the work?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Yes. Certain materials, large 24\u00d724 format tiles, marble showers, imported items, require more installation time or order lead times. We always inform you in advance so there are no surprises.<\/span><\/p>\n<p><i><span style=\"font-weight: 400;\">Solutions R\u00e9novation Qu\u00e9bec (SRQ), RBQ-certified general contractor<\/span><\/i> <i><span style=\"font-weight: 400;\">RBQ license: 5811-7821-01<\/span><\/i> <i><span style=\"font-weight: 400;\">2552 chemin du Fleuve, L\u00e9vis, Qu\u00e9bec, G6W 1Y3<\/span><\/i> <i><span style=\"font-weight: 400;\">Tel.: 418-476-1747 |<\/span><\/i><a href=\"https:\/\/solutionsrenovationquebec.ca\/en\/\"> <i><span style=\"font-weight: 400;\">renovationsolutionsquebec.ca<\/span><\/i><\/a> <i><span style=\"font-weight: 400;\">Areas served: L\u00e9vis, Qu\u00e9bec, Beauce, Chaudi\u00e8re-Appalaches, Centre-du-Qu\u00e9bec, Mauricie, Estrie<\/span><\/i><\/p>","protected":false},"excerpt":{"rendered":"<p>C&rsquo;est probablement la question qu&rsquo;on nous pose le plus souvent avant de commencer un projet. Et honn\u00eatement, c&rsquo;est une bonne question, parce que les d\u00e9lais annonc\u00e9s sur internet sont souvent loin de la r\u00e9alit\u00e9 qu&rsquo;on vit sur le terrain ici, au Qu\u00e9bec. Une r\u00e9novation de salle de bain compl\u00e8te prend en moyenne 4 \u00e0 6 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1954,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1715","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>R\u00e9novation de salle de bain : combien de temps au Qu\u00e9bec?<\/title>\n<meta name=\"description\" content=\"Combien de temps prend une r\u00e9novation de salle de bain au Qu\u00e9bec? Les \u00e9tapes, les d\u00e9lais r\u00e9alistes et ce qui peut allonger le chantier, simplement.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/solutionsrenovationquebec.ca\/en\/bathroom-renovation-how-long-does-it-really-take-in-quebec\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"R\u00e9novation de salle de bain : combien de temps au Qu\u00e9bec?\" \/>\n<meta property=\"og:description\" content=\"Combien de temps prend une r\u00e9novation de salle de bain au Qu\u00e9bec? Les \u00e9tapes, les d\u00e9lais r\u00e9alistes et ce qui peut allonger le chantier, simplement.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/solutionsrenovationquebec.ca\/en\/bathroom-renovation-how-long-does-it-really-take-in-quebec\/\" \/>\n<meta property=\"og:site_name\" content=\"Solutions R\u00e9novation Qu\u00e9bec\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-08T14:45:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-23T19:01:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/solutionsrenovationquebec.ca\/wp-content\/uploads\/2026\/03\/Bathroom-renovation-timeline.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"ilias\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ilias\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\\\/\"},\"author\":{\"name\":\"ilias\",\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/#\\\/schema\\\/person\\\/bc9dfc39f32d5a847eb6f89e333e1877\"},\"headline\":\"R\u00e9novation de salle de bain : combien de temps \u00e7a prend vraiment au Qu\u00e9bec?\",\"datePublished\":\"2026-03-08T14:45:19+00:00\",\"dateModified\":\"2026-07-23T19:01:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\\\/\"},\"wordCount\":2709,\"publisher\":{\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Bathroom-renovation-timeline.webp\",\"inLanguage\":\"en-CA\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\\\/\",\"url\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\\\/\",\"name\":\"R\u00e9novation de salle de bain : combien de temps au Qu\u00e9bec?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Bathroom-renovation-timeline.webp\",\"datePublished\":\"2026-03-08T14:45:19+00:00\",\"dateModified\":\"2026-07-23T19:01:08+00:00\",\"description\":\"Combien de temps prend une r\u00e9novation de salle de bain au Qu\u00e9bec? Les \u00e9tapes, les d\u00e9lais r\u00e9alistes et ce qui peut allonger le chantier, simplement.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\\\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\\\/#primaryimage\",\"url\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Bathroom-renovation-timeline.webp\",\"contentUrl\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Bathroom-renovation-timeline.webp\",\"width\":1920,\"height\":1080,\"caption\":\"\u00c9tapes d'une r\u00e9novation de salle de bain\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"R\u00e9novation de salle de bain : combien de temps \u00e7a prend vraiment au Qu\u00e9bec?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/#website\",\"url\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/\",\"name\":\"Solutions R\u00e9novation Qu\u00e9bec\",\"description\":\"Transforme Ta Maison En Chez-toi. Des solutions de r\u00e9novation tout-en-un partout au Qu\u00e9bec.\",\"publisher\":{\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/#organization\"},\"alternateName\":\"Solution Renovation Quebec\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/#organization\",\"name\":\"Solutions R\u00e9novation Qu\u00e9bec\",\"url\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/Solutions-Renovation-Quebec.png\",\"contentUrl\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/Solutions-Renovation-Quebec.png\",\"width\":237,\"height\":90,\"caption\":\"Solutions R\u00e9novation Qu\u00e9bec\"},\"image\":{\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/#\\\/schema\\\/person\\\/bc9dfc39f32d5a847eb6f89e333e1877\",\"name\":\"ilias\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1f63a10e32bf55b90ceecbc84591fcf08a9c32e5c0eb9c2672fe5ae4e26f5991?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1f63a10e32bf55b90ceecbc84591fcf08a9c32e5c0eb9c2672fe5ae4e26f5991?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1f63a10e32bf55b90ceecbc84591fcf08a9c32e5c0eb9c2672fe5ae4e26f5991?s=96&d=mm&r=g\",\"caption\":\"ilias\"},\"url\":\"https:\\\/\\\/solutionsrenovationquebec.ca\\\/en\\\/author\\\/00235bcf4435cf73\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bathroom renovation: how long in Quebec?","description":"How long does a bathroom renovation take in Quebec? The steps, realistic timelines and what can lengthen the project, simply.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/solutionsrenovationquebec.ca\/en\/bathroom-renovation-how-long-does-it-really-take-in-quebec\/","og_locale":"en_US","og_type":"article","og_title":"R\u00e9novation de salle de bain : combien de temps au Qu\u00e9bec?","og_description":"Combien de temps prend une r\u00e9novation de salle de bain au Qu\u00e9bec? Les \u00e9tapes, les d\u00e9lais r\u00e9alistes et ce qui peut allonger le chantier, simplement.","og_url":"https:\/\/solutionsrenovationquebec.ca\/en\/bathroom-renovation-how-long-does-it-really-take-in-quebec\/","og_site_name":"Solutions R\u00e9novation Qu\u00e9bec","article_published_time":"2026-03-08T14:45:19+00:00","article_modified_time":"2026-07-23T19:01:08+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/solutionsrenovationquebec.ca\/wp-content\/uploads\/2026\/03\/Bathroom-renovation-timeline.webp","type":"image\/webp"}],"author":"ilias","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ilias","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/solutionsrenovationquebec.ca\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/#article","isPartOf":{"@id":"https:\/\/solutionsrenovationquebec.ca\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/"},"author":{"name":"ilias","@id":"https:\/\/solutionsrenovationquebec.ca\/#\/schema\/person\/bc9dfc39f32d5a847eb6f89e333e1877"},"headline":"R\u00e9novation de salle de bain : combien de temps \u00e7a prend vraiment au Qu\u00e9bec?","datePublished":"2026-03-08T14:45:19+00:00","dateModified":"2026-07-23T19:01:08+00:00","mainEntityOfPage":{"@id":"https:\/\/solutionsrenovationquebec.ca\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/"},"wordCount":2709,"publisher":{"@id":"https:\/\/solutionsrenovationquebec.ca\/#organization"},"image":{"@id":"https:\/\/solutionsrenovationquebec.ca\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/#primaryimage"},"thumbnailUrl":"https:\/\/solutionsrenovationquebec.ca\/wp-content\/uploads\/2026\/03\/Bathroom-renovation-timeline.webp","inLanguage":"en-CA"},{"@type":"WebPage","@id":"https:\/\/solutionsrenovationquebec.ca\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/","url":"https:\/\/solutionsrenovationquebec.ca\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/","name":"Bathroom renovation: how long in Quebec?","isPartOf":{"@id":"https:\/\/solutionsrenovationquebec.ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/solutionsrenovationquebec.ca\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/#primaryimage"},"image":{"@id":"https:\/\/solutionsrenovationquebec.ca\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/#primaryimage"},"thumbnailUrl":"https:\/\/solutionsrenovationquebec.ca\/wp-content\/uploads\/2026\/03\/Bathroom-renovation-timeline.webp","datePublished":"2026-03-08T14:45:19+00:00","dateModified":"2026-07-23T19:01:08+00:00","description":"How long does a bathroom renovation take in Quebec? The steps, realistic timelines and what can lengthen the project, simply.","breadcrumb":{"@id":"https:\/\/solutionsrenovationquebec.ca\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/solutionsrenovationquebec.ca\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/solutionsrenovationquebec.ca\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/#primaryimage","url":"https:\/\/solutionsrenovationquebec.ca\/wp-content\/uploads\/2026\/03\/Bathroom-renovation-timeline.webp","contentUrl":"https:\/\/solutionsrenovationquebec.ca\/wp-content\/uploads\/2026\/03\/Bathroom-renovation-timeline.webp","width":1920,"height":1080,"caption":"\u00c9tapes d'une r\u00e9novation de salle de bain"},{"@type":"BreadcrumbList","@id":"https:\/\/solutionsrenovationquebec.ca\/renovation-de-salle-de-bain-combien-de-temps-ca-prend-vraiment-au-quebec\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/solutionsrenovationquebec.ca\/"},{"@type":"ListItem","position":2,"name":"R\u00e9novation de salle de bain : combien de temps \u00e7a prend vraiment au Qu\u00e9bec?"}]},{"@type":"WebSite","@id":"https:\/\/solutionsrenovationquebec.ca\/#website","url":"https:\/\/solutionsrenovationquebec.ca\/","name":"Solutions R\u00e9novation Qu\u00e9bec","description":"Turn Your House Into Your Home. All-in-one renovation solutions throughout Quebec.","publisher":{"@id":"https:\/\/solutionsrenovationquebec.ca\/#organization"},"alternateName":"Solution Renovation Quebec","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/solutionsrenovationquebec.ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Organization","@id":"https:\/\/solutionsrenovationquebec.ca\/#organization","name":"Solutions R\u00e9novation Qu\u00e9bec","url":"https:\/\/solutionsrenovationquebec.ca\/","logo":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/solutionsrenovationquebec.ca\/#\/schema\/logo\/image\/","url":"https:\/\/solutionsrenovationquebec.ca\/wp-content\/uploads\/2025\/11\/Solutions-Renovation-Quebec.png","contentUrl":"https:\/\/solutionsrenovationquebec.ca\/wp-content\/uploads\/2025\/11\/Solutions-Renovation-Quebec.png","width":237,"height":90,"caption":"Solutions R\u00e9novation Qu\u00e9bec"},"image":{"@id":"https:\/\/solutionsrenovationquebec.ca\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/solutionsrenovationquebec.ca\/#\/schema\/person\/bc9dfc39f32d5a847eb6f89e333e1877","name":"ilias","image":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/secure.gravatar.com\/avatar\/1f63a10e32bf55b90ceecbc84591fcf08a9c32e5c0eb9c2672fe5ae4e26f5991?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1f63a10e32bf55b90ceecbc84591fcf08a9c32e5c0eb9c2672fe5ae4e26f5991?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1f63a10e32bf55b90ceecbc84591fcf08a9c32e5c0eb9c2672fe5ae4e26f5991?s=96&d=mm&r=g","caption":"ilias"},"url":"https:\/\/solutionsrenovationquebec.ca\/en\/author\/00235bcf4435cf73\/"}]}},"_links":{"self":[{"href":"https:\/\/solutionsrenovationquebec.ca\/en\/wp-json\/wp\/v2\/posts\/1715","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solutionsrenovationquebec.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solutionsrenovationquebec.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solutionsrenovationquebec.ca\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/solutionsrenovationquebec.ca\/en\/wp-json\/wp\/v2\/comments?post=1715"}],"version-history":[{"count":3,"href":"https:\/\/solutionsrenovationquebec.ca\/en\/wp-json\/wp\/v2\/posts\/1715\/revisions"}],"predecessor-version":[{"id":1728,"href":"https:\/\/solutionsrenovationquebec.ca\/en\/wp-json\/wp\/v2\/posts\/1715\/revisions\/1728"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/solutionsrenovationquebec.ca\/en\/wp-json\/wp\/v2\/media\/1954"}],"wp:attachment":[{"href":"https:\/\/solutionsrenovationquebec.ca\/en\/wp-json\/wp\/v2\/media?parent=1715"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solutionsrenovationquebec.ca\/en\/wp-json\/wp\/v2\/categories?post=1715"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solutionsrenovationquebec.ca\/en\/wp-json\/wp\/v2\/tags?post=1715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}